Point Hope Shipyard Rehabilitation

E.H. Emery Electric Ltd. Vans

Work by Emery Electric included the wiring for a 250 HP 480 volt winch to power the new ship cradle. A new 480 volt 1.5 megawatt shore power kiosk distribution system was also installed.

  • Electrical Consultant – Applied Engineering Solutions